FY 21-25 CIP
RCC Restroom Addition
21-LF-006
Description:
The proposed project would install a septic system and restroom fro the RCC building located at the Spencer Solid Waste Transfer Station. The building was built without a restroom and currently, employees have to use the restroom facilities into the main office of the Transfer Station or Appliance Building.
Justification:
Budget Impact:
AL-JON REFURBISHMENT
22-LF-001
Description:
The proposed project will be sent back to the factory for a complete refurbishment and rebuild of all components, wiring and a new paint job.
Justification:
This preventative work should help extend the overall life of the machine.
Budget Impact:
Mower Replacement
22-LF-002
Description:
The proposed project would purchase a new commercial mower to replace the existing unit.
Justification:
The current mower is a 2007 model that was transferred from the Cemetery.
Budget Impact:
Driveway Pavement
24-LF-001
Description:
The proposed project would pave the driveway and employee parking areas at the landfill. This would be an extension of the paving project at the landfill in FY 2020.
Justification:
The project would help improve operations.
Budget Impact: