FY 21-25 CIP
Capital Improvement Plan City of Spencer, Iowa
FY 21 FY 25 thru
PROJECT SUMMARIES
WTP
BIO SOLID TANK IMPROVEMENTS
22-WTP-001
Description:
The proposed project would re-seal the bio solids tank at the wastewater treatment plant facility.
Justification:
The purpose of the project is to extend the useful life of the current tank.
Budget Impact:
There should be minimal impact on the operating budget due to this project.
DRIVEWAY REPLACEMENT
22-WTP-002
Description:
The proposed project would replace the current concrete driveway at the wastewater treatment plant facility and pave the existing dirt road to the equalization pond.
Justification:
The concrete will be approximately 43 years old at the time of replacement and has deteriorated due to heavy truck traffic.
Budget Impact:
Maintenance costs should go down with new pavement at the facility.
RBC COVER REPLACEMENT
23-WTP-001
Description:
The proposed project will replace five RBC covers on the units at the wastewater treatment plant.
Justification:
The project is part of routine maintenance on the units and will assist in extending the life of each unit.
Budget Impact:
Screw Pump Painting
25-WTP-001
Description:
The proposed project would sandblast and paint the main influent screw pumps at the waste water treatment plant.
Justification:
This is scheduled maintenance that will extend the life span of the equipment.
Budget Impact: