Capital Improvement Plan City of Spencer, Iowa PROJECT SUMMARIES

FY 19 FY 23 thru

Solid Waste

The proposed project will consist of the purchase of a new Automated residential garbage truck. At the time of replacement in 2020, the truck will be 7 years old and at the point of replacement. This project will be an ongoing truck replacement schedule for the two automated collection trucks the city has. 13-SW-001 AUTOMATED RESIDENTIAL TRUCK To maintain reliable equipment, the City schedules replacement of vehicles based on usage and life expectancy. This will ensure that vehicles are getting replaced at the correct timing intervals to ensure continued service delivery. Maintenance costs could increase on these types of trucks versus the traditional rear load due to more mechanics and moving parts. The proposed project is an on going project consisting of the replacement of rear load containers and roll-off collection boxes. 13-SW-002 CONTAINER REPLACEMENT Due to activity and wear, and tear, these containers reach a point of when it is no longer to economically make repairs to them and replacement is the only option.

Description:

Justification:

Budget Impact:

Description: Justification:

Container maintenance will decrease with newer containers.

Budget Impact:

The proposed project would consist of purchasing one new transfer trailer to be used to transfer solid waste from the transfer station to the landfill. 15-SW-001 TRANSFER TRAILER PURCHASE

Description:

At the time of replacement, the current trailer will be 10 years old and in need of replacement.

Justification: Budget Impact:

Maintenance costs should be lower due to newer equipment.

The proposed project would replace the 2005 unit currently being used on the commercial pick up route. 16-SW-001 COMMERCIAL PACKER TRUCK REPLACEMEN

Description: Justification: Budget Impact:

At the time of replacement, the current truck would be 11 years old. Maintenance costs should be lower with a newer vehicle.

The proposed project will rebuild the tipping edge and install new safety equipment. 19-SW-001 TIPPING EDGE REHABILITATION

Description: Justification:

The current tipping edge has worn down over the year of operation and this is part of the preventative maintenance program. The addition of safety equipment will improve employee safety while working near the tipping edge.

Budget Impact:

The proposed project will install a new 26 gauge lining along the ceiling and the walls in the tipping floor area. 19-SW-002 TRANSFER STATION INTERIOR LINING The project will allow the inside of the building to be pressure washed and will repair the current insulation.

Description: Justification: Budget Impact:

The proposed project consists of purchasing a new replacement arm for one of the automated collection trucks. 20-SW-001 AUTOMATED ARM REPLACEMENT Each arm cycles between 600 - 700 times everyday the truck is in operation. General wear and tear will dictate replacement of the arm at this time.

Description: Justification:

Maintenance costs should decrease due to new equipment being installed.

Budget Impact: